Stationary waste treatment facilities - Authorisation
General information
The establishment, the operation and any major changes concerning stationary waste treatment facilities must be approved by the competent authority.
Deadlines
In good time prior to the establishment, the operation or major change concerning the facilities.
Competent authority
for the service Stationary waste treatment facilities - Authorisation:
Abteilung 13 Umwelt und Raumordnung
Stempfergasse 7
8010 Graz,01.Bez.:Innere Stadt
Phone: +43 (316) 877-2491
Fax: +43 (316) 877-3490
Email: abteilung13@stmk.gv.at
Web address: http://verwaltung.steiermark.at
Public office hours
Montag bis Freitag von 8:00 bis 12:30 Uhr und nach Terminvereinbarung
Additional information
The waste management authority which is locally in charge of the site.
- The Provincial Governor German text
- The Provincial Governor may delegate procedures and supervision to the district administrative authority [ Bezirksverwaltungsbehörde] .
Required documents
The following documents have to be attached to the application for authorisation in quadruplicate:
- Information about the suitability of the intended site
- Information about the type, purpose, scope, and duration of the project
- Land register identification of the property affected by the treatment facilities, indicating the name of the owner and enclosing an extract from the land register (not older than six weeks)
- If the applicant is not himself/herself the owner additionally the written consent of the property owner on whose property the treatment facilities are to be established
- Indication of the name of the owner of any lawfully practised water utilisation
- Description of the operation (including information about the types of waste to be treated, the treatment methods, the capacity and a list of the machinery and other equipment of the facilities)
- For facilities covering incineration or co-incineration with energy recovery, a description of the energy efficiency
- Construction specifications with the necessary designs and drawings
- Waste management plan
- Description of the anticipated emissions from the treatment facilities and information about the prevention or, if this is not possible, the reduction of emissions
- Description of the measures taken to ensure compliance with the treatment obligations as provided for in the Abfallwirtschaftsgesetz
In case of an application for authorisation of a landfill the following has to be enclosed in four copies in addition to the documents set out above:
- Information about the hydrological, geological and water management characteristics of the site
- Information about the (sub-)type of landfill and the planned total volume
- Operating and monitoring plan (including a description of measures planned to protect the environment, in particular the air and water bodies, indicating the planned measuring methods, information about the technical landfill requirements and the safety engineering measures)
- Information about measures to prevent incidents and control their consequences for man and the environment
- Information about the measures planned for the case of abandonment of the landfill operation (preliminary abandonment plan) and follow-up measures, in particular a monitoring plan
- Information about the type and scope of surety
- Presentation of the coverage for costs of construction, the estimated costs of operation, abandonment and follow-up in the amount to be charged for the dumping of all wastes in the landfill
Caution
When applying for a permit for a IPPC Treatment Plant , additional documents must be enclosed.
Costs
Costs depend on the various ordinances on levies and fees. Please ask the competent body in advance.
Data protection
I have noted that the data provided by me, as well as any data received by the administration over the course of the preliminary investigation, will be automatically processed as per article 6, para. 1 lit. c and e of the General Data Protection Regulation in accordance with the underlying material laws of the legal process. Furthermore, I am aware that this is for the purpose of executing the legal procedure initiated by me, the granting of regulatory approval and also for the purpose of review. I have read the general information regarding:
- the right to access, rectification, erasure, restriction of processing, withdrawal and objection, as well as on data portability
- the right to lodge a complaint with the Austrian data protection authority
- the responsibilities of the process controller and the data protection officer as per https://datenschutz.stmk.gv.at.