Landfill notification
Online forms
edm.gv.at ( → BMLUK ) German text
Entrepreneurs registered in the Business Service Portal USP have the possibility to use this and many other online procedures German text with one single logging into the USP . More detailed information on the registration in the USP is available in the online guidance on USP registration .
General information
Owners of landfills must notify
- the total waste quantities landfilled in the previous calendar year (split-up according to waste owners and types of waste) and
- the residual capacities in cubic metres
as electronic "Waste Input Output Notification" via edm.gv.at to the Federal Ministry of Agriculture and Forestry, Climate and Environmental Protection, Regions and Water Management.
Prerequisites
In order to be able to submit the notifications, it is required to register (once) with the Master Data Register "ZAReg".
Deadlines
The notification must have taken place by the 15 March of the calendar year subsequent to the reporting period.
Procedure
The owner of the landfill logs into the register on edm.gv.at using his/her access data (user name and password) and there uploads his/her landfill notification ( XML file) under " Meldewesen " in the application "e Bilanzen ".
Required documents
The landfill notification must be uploaded as XML file into edm.gv.at ( → BMLUK ) . The necessary contents and structures are set out in the Deponieverordnung .
Assistance can be found at edm.gv.at ( → BMLUK ) .
Please note
The necessary data and the required file format for the electronic transmission have been published on edm.gv.at.
Legal basis
- section 21 paragraph 4 of the Abfallwirtschaftsgesetz (AWG)
- section 41 of the Deponieverordnung
Data protection
I have noted that the data provided by me, as well as any data received by the administration over the course of the preliminary investigation, will be automatically processed as per article 6, para. 1 lit. c and e of the General Data Protection Regulation in accordance with the underlying material laws of the legal process. Furthermore, I am aware that this is for the purpose of executing the legal procedure initiated by me, the granting of regulatory approval and also for the purpose of review. I have read the general information regarding:
- the right to access, rectification, erasure, restriction of processing, withdrawal and objection, as well as on data portability
- the right to lodge a complaint with the Austrian data protection authority
- the responsibilities of the process controller and the data protection officer as per https://datenschutz.stmk.gv.at.
